|

Erosion
matting installed following soil remediation at the Rocky Flats 903
Lip Area.
WWE
has provided problem-solving water management expertise to DOE and
its contractors since 1989. Performance on the initial contract with
the Rocky Flats Environmental Technology Site led to numerous
additional projects that have solved a broad spectrum of complex
water management issues. WWE's high professional standards were key
to successful completion of projects under scrutiny from citizen
groups and local, state, and federal agencies.
|
Scope of Services
- Water Quality Evaluations
- Expert Testimony
- Water Management Planning
- Hydrologic Modeling
- Hydrogeologic Modeling
- Drainage and Flood Control
Master Planning and Design
- Dam Services including
Inspection and Design
- Contaminant Transport Modeling
- Environmental Assessments
- Water Rights Analyses
Representative Projects
- Colorado Water Quality Control
Commission Testimony, 1989-1995
- Rocky Flats Surface Water
Management Plan, 1990-1991
- Rocky Flats Storage Ponds
Hydrologic Model, 1991-1992
- Drainage And Flood Control
Master Plan, 1992
- Dam Inspection, Evaluation, And
Design, 1999-2005
- Hillslope Erosion And Sediment
Transport Modeling, 2000
- Post-Fire Hydrologic Modeling,
2000-2003
- Actinide Migration Pathway
Analysis, 2002
- Environmental Assessment For
Site Reconfiguration, 2004
- 903 Area Interim Measure/Interim
Remedial Action (IM/IRA) Plan, 2004
- Groundwater Interim
Measure/Interim Remedial Action (IM/IRA) Plan, 2005
- Water Rights, 2005-Present
|